Executed Projects

Engineering, Procurement and Installation and Commissioning of Fuel Gas Skids For TG at NQO AND for NQG PGC Train A &Train C.

Client - ONGC

START DATE

Sep-04

COMPLETION DATE

May-07

Engineering, Procurement and commissioning of IUG Skids at 13 Unmanned Platforms

Client - ONGC

START DATE

Mar-06

COMPLETION DATE

Jun-09

Engineering, Procurement and commissioning for Revamping of Produced Water Conditioning System At BPB Platform.

Client - ONGC

START DATE

May-07

COMPLETION DATE

Apr-09

Engineering, Procurement and commissioning for Revamping of Gas Dehydration Unit (GDU) at BHS Platform

Client - ONGC

START DATE

Oct-08

COMPLETION DATE

Mar-11

Engineering, Procurement and commissioning for Revamping of Glycol and Hot Oil Circulation System at SHP and replacement of Hot oil and cooling water system at BHS and supply, installation, commissioning of ultrasonic flow meter at SHG platform .

Client - ONGC

START DATE

Dec-10

COMPLETION DATE

Oct-12

Engineering, Procurement and commissioning for “Replacement of PWC system at BHS,ICP & SCA platforms along with O&M of PWC systems for 03 years

Client - ONGC

START DATE

Jul-10

COMPLETION DATE

May-13

Engineering, Procurement, Installation and commissioning for 2 MOL pump packages, 2 Nos of Water makers and 2 No of Water Heater Packages along with all electrical, piping , instrument works and integration with DCS, PLC system at Neelam Platform.

Client - ONGC

START DATE

Aug-12

COMPLETION DATE

Feb-15

Revamp of Condensate Drain System of PGC A,B,C and auto draining System of Flare KOD’s At Heera Platform

Client - ONGC

START DATE

Apr-13

COMPLETION DATE

Apr-15

Engineering, Procurement, Installation and commissioning for 2 Nos DO Tower and 6 Nos Fine Filters along with associated pipings and replacement of new control system of Fine Filter with Chemical Dosing Pump at ICW Platform

Client - ONGC

START DATE

Sep-13

COMPLETION DATE

Jul-15

Revamping of Gas Dehydration Unit (GDU) trains at Neelam and Heera platforms on turnkey basis.

Client - ONGC

START DATE

Dec-14

COMPLETION DATE

Feb-17

Revamping of PGCs Cooler at Neelam Platform

Client - ONGC

START DATE

Dec-14

COMPLETION DATE

Mar-17

Engineering, Procurement, Supply, Installation, Commissioning, Start up and Operation & Maintenance of Gas Dehydration System at Cauvery Asset.

Client - ONGC

START DATE

Dec-15

COMPLETION DATE

Jun-16

Design, Supply, Fabrication, Installation, Testing and Commissioning of DCP Fire Protection System on 21 nos. wellhead platforms. Pre-engineering Survey, Revamping Modification, strengthening works, engineering, procurement, fabrication, load out, transportation and replacement of Handrail, Grating, Chequered plates, Staircase, Life Craft, Scramble Nets on 21 nos. wellhead platforms. Pre-engineering Survey, Revamping Modification, Strengthening works, engineering, procurement, fabrication, load out, transportation and replacement of Helideck on 7 nos. wellhead platforms

Client - ONGC

START DATE

Dec-13

COMPLETION DATE

May-17